NEFCO — DemoUkrainaDH —Supply and Installation of biomass boiler with capacity 2.5 MW in Chernivtsi City


Chernivtsi, Ukraine
- 2019-01-14 12:29:34
  • Client:
  • Chernivtsiteplokomunenergo
  • Partners:
  • Uniconfort Srl

The project includes reconstruction of the existing boiler house with the connection to the two heating networks which are supplying heat to the two heating districts of Chernivtsi city. In the framework of the project wood pellets boiler with capacity 2.5 MW and with auxilary equipment will be installed. The boiler and main eqipment will be manufactured by Uniconfort company, San Martino di Lupari, Padua, Italy.


  • Development of detail project design documentation;
  • Local project management;
  • Project implementation support, local procurement management and supervision of installation works.