Reliable energy supply for a shopping mall: installation of an Avus 1000 plus cogeneration unit (1 MW)
4 months.
natural gas.
A shopping mall in the Ivano-Frankivsk region needed a stable power supply that could withstand peak loads, reduce dependence on external sources and cut energy costs. In addition, the owner wanted to make efficient use of the excess heat generated by the electricity production process and integrate the new equipment with the already installed solar power plant.
1 MWh — electric power.
Powered by natural gas, based on gas piston engines.
Modular design, easy to transport and quick to install.
Trigeneration — production of electricity, heat and cold water.
Integration with solar power plants for combined energy supply and cost reduction.
The project to install a cogeneration unit was an important step in improving the energy efficiency and reliability of the shopping mall in Ivano-Frankivsk region. Thanks to the combination of cogeneration, trigeneration and integration with a solar power plant, the facility received a stable energy supply, reduced electricity and heat costs, and increased its energy independence.
The project proved that modern distributed generation technologies are not only cost-effective but also strategically important for businesses seeking stability and efficient use of resources.
Contact our managers for a free consultation and learn about the benefits, cost, and payback of the project for your business.
Thank you for your request! The manager will contact you shortly to answer all your questions.
In the meantime, check out our implemented projects.
Periodically, you will receive letters from us with all the latest news from the field of bioenergy.
So that the letters do not end up in spam, please add info@pro-energy.com.ua to the list of contacts in the mail.
We will be in touch!